GMPc Vietnam JSC
  • About Us  
    • Summary information
    • Key Personnel
  • Services  
    • WHO GMP Pharmaceutical facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • EU GMP Pharmaceutical Factory  
      • Feasibility study report
      • Design detailed construction drawings
      • QM documentation – Validation
      • GMP application and product dossier application
      • Project management - Construction supervision
    • CGMP, ISO 22716-certified cosmetics facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • CGMP ASEAN Training and Guidance
      • Preparation of CGMP ASEAN/ ISO 22716 registration dossier
      • CGMP ASEAN Re-evaluation consultation
    • Health-supplement facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • HS GMP Training and Guidance
      • Preparation HS GMP registration dossier
      • HS GMP - Re-evaluation consultation
    • Eligibility For Cosmetic Manufacturing  
      • Overall consultation
      • Detail Construction and MEP drawing
      • Designing, Constructing, Ensured Certification
      • Preparation of Registration Dossier
    • Pharmaceutical distribution center  
      • Feasibility Study
      • Design and Information Technology Solutions
      • Project Management and Supervision
      • GSP registration and operation consultancy
    • GSP warehouses  
      • Project feasibility study
      • Detail Construction and MEP drawing
      • GSP Training and Guidance
      • Overall Consultation on Designing And Constructing
      • GSP Re-evaluation consultation
    • Veterinary Pharmaceutical Facilities  
      • Project Feasibility Study
      • Technology and Equipment consultation
      • Detail Construction and MEP Drawing
      • Project management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • GMP, GLP, GSP training  
      • Basis knowledge
      • Intensive Training
    • Other GPs’s consultation  
      • GLP inspection laboratories
      • GDP distribution systems
      • GPP pharmacy
      • WHO GACP medicinal materials
    • Register and Announce  
      • Announcement of Imported Cosmetic
    • Dairy Factory  
      • Overall Planning
      • Detailed Construction & MEP Design - Project Budgeting
      • Contractor/Supplier Consultation and Project Management
      • Training, Drafting registration dossier
  • Project
  • Video
  • GMP-Handbook
  • Faqs
  • News
  • Jobs
  • Contact

    FAQS

  1. Home
  2. FAQS
  3. MATERIAL

List of FAQS

  • GMP GENERAL QUESTION
  • FACILITY AND EQUIPMENT
  • PERSONNEL
  • MATERIAL
  • PRODUCTION AND PROCESS CONTROL
  • HOLDING AND DISTRIBUTION
  • LABORATORY CONTROL
  • RECORD AND REPORT
  • AUDIT
  • OTHER Q&A
A batch of an API has been released before all testing and final approval was completed. How do I handle this in the certification of the final product?

20/07/2021 | 3052

Similar question:

Reply:

Within the EU shipment of unapproved API is not be acceptable under EU law. For shipments outside of the EU the local laws would have to be checked. It would be necessary to check what is stated in the API producer’s SOP with reference to shipping unapproved material and whether that contravened any regulatory laws. The quality agreement between the API producer, the contract manufacturer and the MA holder should also be looked at to see if there is any reference to the movement of unapproved material being acceptable. It is not good practice to ship unapproved materials and as such this should have been picked up by the quality person releasing the API. Further, a deviation should have been raised and a full investigation carried out as to the root-cause. In addition the contract manufacturer should have quarantined this material on receipt and also raised a deviation to find out what went wrong. If this was a one-off incident and not a fundamental break down of the API’s manufacturers and/or the contract manufacturers Quality System, then as long as the API was formally approved, you should reference the deviation report and as long as everything else was in order, certify the final drug product. However, if this incident was part of a systematic failure of the Quality System would recommend not to certify the drug product as the potential for other GMP non-conformances would be too great. The follow-up to the deviation could involve an audit of the API producer initiated by the MA holder.

Related Q&A

How can GMP compliance for active-substance manufacturers be demonstrated? See more How can GMP compliance for active-substance... See more
Do I need to perform an audit of an active substance supplier if it has been inspected by... See more Do I need to perform an... See more
Is it acceptable to perform a remote assessment based on, for example, questionaires, review of documents, ISO 9000... See more Is it acceptable to perform a... See more
How do the new requirements affect importers of medicinal products? See more How do the new requirements affect... See more
Is it possible to ask for a voluntary inspection of an active substance manufacturer? See more Is it possible to ask for... See more
The notice to applicants requires the submission of a declaration signed by the qualified person (QP) that the... See more The notice to applicants requires the... See more
What kindof GMP documentation is needed for an active substance manufacturer that performs sterilization of an active substance?... See more What kindof GMP documentation is needed... See more
During inspections, why do inspectors sometimes ask to see reports of audits of active substance manufacturers carried out... See more During inspections, why do inspectors sometimes... See more
What expectations do inspectors have for the content of reports of audits of active substance manufacturers carried out... See more What expectations do inspectors have for... See more
How should active substance auditors be qualified? See more How should active substance auditors be... See more
<123>
  • GMPc Vietnam JSC
  • Head Office: No. 18, Mang Cam 1 Street, An Lac Green Symphony, Van Canh Ward, Hoai Duc District, Hanoi City
  • Business location : No. 32, Vi Cam 5 Street, An Lac Green Symphony, Van Canh Ward, Hoai Duc District, Hanoi City
  • Tel: 0243.787.2242 | CEO hotline: 0982.866.668
  • Email: contact@gmp.com.vn
  • Representative Office: 156/1/1, Cong Hoa Street - Ward 12 - Tan Binh District - Ho Chi Minh City
  • Tel: 0283.811.7383 
  • Quick link
  • About Us
  • Services
  • Project
  • GMP-Handbook
  • Video
  • Consulting for cosmetic facility
  • Consulting for health supplement facility
  • Consulting for GSP warehouse
  • Fanpage
Facebook

Copyright © 2020 GMPc. All rights reserved.

  • Home
  • About Us
    • Summary information
    • Key Personnel
  • Services
    • WHO GMP Pharmaceutical facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • EU GMP Pharmaceutical Factory
      • Feasibility study report
      • Design detailed construction drawings
      • QM documentation – Validation
      • GMP application and product dossier application
      • Project management - Construction supervision
    • CGMP, ISO 22716-certified cosmetics facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • CGMP ASEAN Training and Guidance
      • Preparation of CGMP ASEAN/ ISO 22716 registration dossier
      • CGMP ASEAN Re-evaluation consultation
    • Health-supplement facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • HS GMP Training and Guidance
      • Preparation HS GMP registration dossier
      • HS GMP - Re-evaluation consultation
    • Eligibility For Cosmetic Manufacturing
      • Overall consultation
      • Detail Construction and MEP drawing
      • Designing, Constructing, Ensured Certification
      • Preparation of Registration Dossier
    • Pharmaceutical distribution center
      • Feasibility Study
      • Design and Information Technology Solutions
      • Project Management and Supervision
      • GSP registration and operation consultancy
    • GSP warehouses
      • Project feasibility study
      • Detail Construction and MEP drawing
      • GSP Training and Guidance
      • Overall Consultation on Designing And Constructing
      • GSP Re-evaluation consultation
    • Veterinary Pharmaceutical Facilities
      • Project Feasibility Study
      • Technology and Equipment consultation
      • Detail Construction and MEP Drawing
      • Project management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • GMP, GLP, GSP training
      • Basis knowledge
      • Intensive Training
    • Other GPs’s consultation
      • GLP inspection laboratories
      • GDP distribution systems
      • GPP pharmacy
      • WHO GACP medicinal materials
    • Register and Announce
      • Announcement of Imported Cosmetic
    • Dairy Factory
      • Overall Planning
      • Detailed Construction & MEP Design - Project Budgeting
      • Contractor/Supplier Consultation and Project Management
      • Training, Drafting registration dossier
  • Project
  • Video
  • GMP-Handbook
  • Faqs
  • News
  • Jobs
  • Contact
 
Hotline: 0982.866.668
Nhắn tin Facebook Zalo: 0982.866.668