GMPc Vietnam JSC
  • About Us  
    • Summary information
    • Key Personnel
  • Services  
    • WHO GMP Pharmaceutical facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • EU GMP Pharmaceutical Factory  
      • Feasibility study report
      • Design detailed construction drawings
      • QM documentation – Validation
      • GMP application and product dossier application
      • Project management - Construction supervision
    • CGMP, ISO 22716-certified cosmetics facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • CGMP ASEAN Training and Guidance
      • Preparation of CGMP ASEAN/ ISO 22716 registration dossier
      • CGMP ASEAN Re-evaluation consultation
    • Health-supplement facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • HS GMP Training and Guidance
      • Preparation HS GMP registration dossier
      • HS GMP - Re-evaluation consultation
    • Eligibility For Cosmetic Manufacturing  
      • Overall consultation
      • Detail Construction and MEP drawing
      • Designing, Constructing, Ensured Certification
      • Preparation of Registration Dossier
    • Pharmaceutical distribution center  
      • Feasibility Study
      • Design and Information Technology Solutions
      • Project Management and Supervision
      • GSP registration and operation consultancy
    • GSP warehouses  
      • Project feasibility study
      • Detail Construction and MEP drawing
      • GSP Training and Guidance
      • Overall Consultation on Designing And Constructing
      • GSP Re-evaluation consultation
    • Veterinary Pharmaceutical Facilities  
      • Project Feasibility Study
      • Technology and Equipment consultation
      • Detail Construction and MEP Drawing
      • Project management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • GMP, GLP, GSP training  
      • Basis knowledge
      • Intensive Training
    • Other GPs’s consultation  
      • GLP inspection laboratories
      • GDP distribution systems
      • GPP pharmacy
      • WHO GACP medicinal materials
    • Register and Announce  
      • Announcement of Imported Cosmetic
    • Dairy Factory  
      • Overall Planning
      • Detailed Construction & MEP Design - Project Budgeting
      • Contractor/Supplier Consultation and Project Management
      • Training, Drafting registration dossier
  • Project
  • Video
  • GMP-Handbook
  • Faqs
  • News
  • Jobs
  • Contact

    FAQS

  1. Home
  2. FAQS
  3. HOLDING AND DISTRIBUTION

List of FAQS

  • GMP GENERAL QUESTION
  • FACILITY AND EQUIPMENT
  • PERSONNEL
  • MATERIAL
  • PRODUCTION AND PROCESS CONTROL
  • HOLDING AND DISTRIBUTION
  • LABORATORY CONTROL
  • RECORD AND REPORT
  • AUDIT
  • OTHER Q&A
Do CGMPs require three successful process validation batches before a new active pharmaceutical ingredient (API) or a finished drug product is released for distribution?

17/09/2021 | 3159

Similar question:

Reply:

No. Neither the CGMP regulations nor FDA policy specifies a minimum number of batches to validate a manufacturing process. The current industry guidance on APIs (see ICH Q7A3 for APIs) also does not specify a specific number of batches for process validation.

FDA recognizes that validating a manufacturing process, or a change to a process, cannot be reduced to so simplistic a formula as the completion of three successful full scale batches. The agency acknowledges that the idea of three validation batches has become prevalent, in part due to language in its own guidance documents. However, FDA is now clarifying current expectations on process validation. The 1987 Guideline of General Principles of Process Validation is currently being revised to address this issue. The emphasis for demonstrating validated processes is placed on the manufacturer’s process design and development studies in addition to its demonstration

of reproducibility at scale, a goal that has always been expected.
However, a minimum number of conformance (a.k.a. validation) batches necessary to validate the

manufacturing processes is not specified. The manufacturer is expected to have a sound rationale for its choices in this regard. The agency encourages the use of science based approaches to process validation.

Related Q&A

What happens if a firm does not voluntarily recall a defective product? See more What happens if a firm does... See more
<12
  • GMPc Vietnam JSC
  • Head Office: No. 18, Mang Cam 1 Street, An Lac Green Symphony, Van Canh Ward, Hoai Duc District, Hanoi City
  • Business location : No. 32, Vi Cam 5 Street, An Lac Green Symphony, Van Canh Ward, Hoai Duc District, Hanoi City
  • Tel: 0243.787.2242 | CEO hotline: 0982.866.668
  • Email: contact@gmp.com.vn
  • Representative Office: 156/1/1, Cong Hoa Street - Ward 12 - Tan Binh District - Ho Chi Minh City
  • Tel: 0283.811.7383 
  • Quick link
  • About Us
  • Services
  • Project
  • GMP-Handbook
  • Video
  • Consulting for cosmetic facility
  • Consulting for health supplement facility
  • Consulting for GSP warehouse
  • Fanpage
Facebook

Copyright © 2020 GMPc. All rights reserved.

  • Home
  • About Us
    • Summary information
    • Key Personnel
  • Services
    • WHO GMP Pharmaceutical facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • EU GMP Pharmaceutical Factory
      • Feasibility study report
      • Design detailed construction drawings
      • QM documentation – Validation
      • GMP application and product dossier application
      • Project management - Construction supervision
    • CGMP, ISO 22716-certified cosmetics facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • CGMP ASEAN Training and Guidance
      • Preparation of CGMP ASEAN/ ISO 22716 registration dossier
      • CGMP ASEAN Re-evaluation consultation
    • Health-supplement facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • HS GMP Training and Guidance
      • Preparation HS GMP registration dossier
      • HS GMP - Re-evaluation consultation
    • Eligibility For Cosmetic Manufacturing
      • Overall consultation
      • Detail Construction and MEP drawing
      • Designing, Constructing, Ensured Certification
      • Preparation of Registration Dossier
    • Pharmaceutical distribution center
      • Feasibility Study
      • Design and Information Technology Solutions
      • Project Management and Supervision
      • GSP registration and operation consultancy
    • GSP warehouses
      • Project feasibility study
      • Detail Construction and MEP drawing
      • GSP Training and Guidance
      • Overall Consultation on Designing And Constructing
      • GSP Re-evaluation consultation
    • Veterinary Pharmaceutical Facilities
      • Project Feasibility Study
      • Technology and Equipment consultation
      • Detail Construction and MEP Drawing
      • Project management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • GMP, GLP, GSP training
      • Basis knowledge
      • Intensive Training
    • Other GPs’s consultation
      • GLP inspection laboratories
      • GDP distribution systems
      • GPP pharmacy
      • WHO GACP medicinal materials
    • Register and Announce
      • Announcement of Imported Cosmetic
    • Dairy Factory
      • Overall Planning
      • Detailed Construction & MEP Design - Project Budgeting
      • Contractor/Supplier Consultation and Project Management
      • Training, Drafting registration dossier
  • Project
  • Video
  • GMP-Handbook
  • Faqs
  • News
  • Jobs
  • Contact
 
Hotline: 0982.866.668
Nhắn tin Facebook Zalo: 0982.866.668