GMPc Vietnam JSC
  • About Us  
    • Summary information
    • Key Personnel
  • Services  
    • WHO GMP Pharmaceutical facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • EU GMP Pharmaceutical Factory  
      • Feasibility study report
      • Design detailed construction drawings
      • QM documentation – Validation
      • GMP application and product dossier application
      • Project management - Construction supervision
    • CGMP, ISO 22716-certified cosmetics facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • CGMP ASEAN Training and Guidance
      • Preparation of CGMP ASEAN/ ISO 22716 registration dossier
      • CGMP ASEAN Re-evaluation consultation
    • Health-supplement facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • HS GMP Training and Guidance
      • Preparation HS GMP registration dossier
      • HS GMP - Re-evaluation consultation
    • Eligibility For Cosmetic Manufacturing  
      • Overall consultation
      • Detail Construction and MEP drawing
      • Designing, Constructing, Ensured Certification
      • Preparation of Registration Dossier
    • Pharmaceutical distribution center  
      • Feasibility Study
      • Design and Information Technology Solutions
      • Project Management and Supervision
      • GSP registration and operation consultancy
    • GSP warehouses  
      • Project feasibility study
      • Detail Construction and MEP drawing
      • GSP Training and Guidance
      • Overall Consultation on Designing And Constructing
      • GSP Re-evaluation consultation
    • Veterinary Pharmaceutical Facilities  
      • Project Feasibility Study
      • Technology and Equipment consultation
      • Detail Construction and MEP Drawing
      • Project management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • GMP, GLP, GSP training  
      • Basis knowledge
      • Intensive Training
    • Other GPs’s consultation  
      • GLP inspection laboratories
      • GDP distribution systems
      • GPP pharmacy
      • WHO GACP medicinal materials
    • Register and Announce  
      • Announcement of Imported Cosmetic
    • Dairy Factory  
      • Overall Planning
      • Detailed Construction & MEP Design - Project Budgeting
      • Contractor/Supplier Consultation and Project Management
      • Training, Drafting registration dossier
  • Project
  • Video
  • GMP-Handbook
  • Faqs
  • News
  • Jobs
  • Contact

    FAQS

  1. Home
  2. FAQS
  3. RECORD AND REPORT

List of FAQS

  • GMP GENERAL QUESTION
  • FACILITY AND EQUIPMENT
  • PERSONNEL
  • MATERIAL
  • PRODUCTION AND PROCESS CONTROL
  • HOLDING AND DISTRIBUTION
  • LABORATORY CONTROL
  • RECORD AND REPORT
  • AUDIT
  • OTHER Q&A
Some products, such as transdermal patches, are made using manufacturing processes with higher in-process material reject rates than for other products and processes. Is this okay?

19/09/2021 | 1292

Similar question:

Reply:

Maybe.  It depends on the cause and consistency of the reject rate.  Many transdermal patch manufacturing processes produce more waste (i.e., lower yield theoretical) than other pharmaceutical processes.  This should not of itself be a concern.  The waste is usually due to the cumulative effect of roll splicing, line start-ups and stoppages, roll-stock changes, and perhaps higher rates of in-process sampling.  This is most pronounced for processes involving lamination of rolls of various component layers.  Roll-stock defects detected during adhesive coating of the roll, for example, can often only be rejected the roll after final fabrication/lamination of the entire patch, which contributes to the final process waste stream.

We expect that validated and well-controlled processes will achieve fairly consistent waste amounts batch-to-batch.  Waste in excess of the normal operating rates may need (see 21 CFR 211.192) to be evaluated to determine cause (e.g., due to increase in sampling or higher than normal component defects ... or both) and the consequences on product quality assessed.  We've seen a small number of cases where unusually high intra-batch rejects/losses were due to excessive component quality variability and poorly developed processes.

Related Q&A

Do the CGMP regulations permit the destruction of an internal quality assurance audit report once the corrective action... See more Do the CGMP regulations permit the... See more
How do the part 11 regulations and "predicate rule requirements" (in 21 CFR part 211) apply to the... See more How do the part 11 regulations... See more
How does FDA interpret the regulations (21 CFR part 211) regarding the establishment of expiry dating for chemicals,... See more How does FDA interpret the regulations... See more
s it necessary to retain a sufficient number of samples of each batch of a sterile medicinal product... See more s it necessary to retain a... See more
Do formal tools and a full report have to be issued for every risk assessment? See more Do formal tools and a full... See more
  • GMPc Vietnam JSC
  • Head Office: No. 18, Mang Cam 1 Street, An Lac Green Symphony, Van Canh Ward, Hoai Duc District, Hanoi City
  • Business location : No. 32, Vi Cam 5 Street, An Lac Green Symphony, Van Canh Ward, Hoai Duc District, Hanoi City
  • Tel: 0243.787.2242 | CEO hotline: 0982.866.668
  • Email: contact@gmp.com.vn
  • Representative Office: 156/1/1, Cong Hoa Street - Ward 12 - Tan Binh District - Ho Chi Minh City
  • Tel: 0283.811.7383 
  • Quick link
  • About Us
  • Services
  • Project
  • GMP-Handbook
  • Video
  • Consulting for cosmetic facility
  • Consulting for health supplement facility
  • Consulting for GSP warehouse
  • Fanpage
Facebook

Copyright © 2020 GMPc. All rights reserved.

  • Home
  • About Us
    • Summary information
    • Key Personnel
  • Services
    • WHO GMP Pharmaceutical facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • EU GMP Pharmaceutical Factory
      • Feasibility study report
      • Design detailed construction drawings
      • QM documentation – Validation
      • GMP application and product dossier application
      • Project management - Construction supervision
    • CGMP, ISO 22716-certified cosmetics facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • CGMP ASEAN Training and Guidance
      • Preparation of CGMP ASEAN/ ISO 22716 registration dossier
      • CGMP ASEAN Re-evaluation consultation
    • Health-supplement facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • HS GMP Training and Guidance
      • Preparation HS GMP registration dossier
      • HS GMP - Re-evaluation consultation
    • Eligibility For Cosmetic Manufacturing
      • Overall consultation
      • Detail Construction and MEP drawing
      • Designing, Constructing, Ensured Certification
      • Preparation of Registration Dossier
    • Pharmaceutical distribution center
      • Feasibility Study
      • Design and Information Technology Solutions
      • Project Management and Supervision
      • GSP registration and operation consultancy
    • GSP warehouses
      • Project feasibility study
      • Detail Construction and MEP drawing
      • GSP Training and Guidance
      • Overall Consultation on Designing And Constructing
      • GSP Re-evaluation consultation
    • Veterinary Pharmaceutical Facilities
      • Project Feasibility Study
      • Technology and Equipment consultation
      • Detail Construction and MEP Drawing
      • Project management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • GMP, GLP, GSP training
      • Basis knowledge
      • Intensive Training
    • Other GPs’s consultation
      • GLP inspection laboratories
      • GDP distribution systems
      • GPP pharmacy
      • WHO GACP medicinal materials
    • Register and Announce
      • Announcement of Imported Cosmetic
    • Dairy Factory
      • Overall Planning
      • Detailed Construction & MEP Design - Project Budgeting
      • Contractor/Supplier Consultation and Project Management
      • Training, Drafting registration dossier
  • Project
  • Video
  • GMP-Handbook
  • Faqs
  • News
  • Jobs
  • Contact
 
Hotline: 0982.866.668
Nhắn tin Facebook Zalo: 0982.866.668