GMPc Vietnam JSC
  • About Us  
    • Summary information
    • Key Personnel
  • Services  
    • WHO GMP Pharmaceutical facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • EU GMP Pharmaceutical Factory  
      • Feasibility study report
      • Design detailed construction drawings
      • QM documentation – Validation
      • GMP application and product dossier application
      • Project management - Construction supervision
    • CGMP, ISO 22716-certified cosmetics facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • CGMP ASEAN Training and Guidance
      • Preparation of CGMP ASEAN/ ISO 22716 registration dossier
      • CGMP ASEAN Re-evaluation consultation
    • Health-supplement facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • HS GMP Training and Guidance
      • Preparation HS GMP registration dossier
      • HS GMP - Re-evaluation consultation
    • Eligibility For Cosmetic Manufacturing  
      • Overall consultation
      • Detail Construction and MEP drawing
      • Designing, Constructing, Ensured Certification
      • Preparation of Registration Dossier
    • Pharmaceutical distribution center  
      • Feasibility Study
      • Design and Information Technology Solutions
      • Project Management and Supervision
      • GSP registration and operation consultancy
    • GSP warehouses  
      • Project feasibility study
      • Detail Construction and MEP drawing
      • GSP Training and Guidance
      • Overall Consultation on Designing And Constructing
      • GSP Re-evaluation consultation
    • Veterinary Pharmaceutical Facilities  
      • Project Feasibility Study
      • Technology and Equipment consultation
      • Detail Construction and MEP Drawing
      • Project management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • GMP, GLP, GSP training  
      • Basis knowledge
      • Intensive Training
    • Other GPs’s consultation  
      • GLP inspection laboratories
      • GDP distribution systems
      • GPP pharmacy
      • WHO GACP medicinal materials
    • Register and Announce  
      • Announcement of Imported Cosmetic
    • Dairy Factory  
      • Overall Planning
      • Detailed Construction & MEP Design - Project Budgeting
      • Contractor/Supplier Consultation and Project Management
      • Training, Drafting registration dossier
  • Project
  • Video
  • GMP-Handbook
  • Faqs
  • News
  • Jobs
  • Contact

    News

  1. Home
  2. News
  3. Field News

News category

  • GMPC News
    • Notification
    • Activities & Cooperation
    • Internal News
  • Field News
    • Exhibition & Conference
    • News
    • Typical GMP enterprise
  • GMP Projects News
    • GMPc contract
    • Project Progress Updates

Governance of data integrity: From ALCOA+ principles to sustainable compliance strategies

19/03/2026 | 555 | Field News

In the era of digital transformation within the pharmaceutical industry, Data Integrity is more than a technical requirement; it is the fundamental cornerstone safeguarding patient safety and corporate regulatory standing. Inaccurate or incomplete data can lead to flawed decision-making, potentially endangering lives and resulting in severe regulatory penalties global authorities such as the FDA or EMA.

To establish the highest standards of data integrity, the global pharmaceutical industry relies on the golden principles: ALCOA and ALCOA+.

1. ALCOA: The 5 Essential Pillars of Pharmaceutical Data

For management and operational levels, ALCOA defines the minimum requirements for data to be considered "legally valid" and trustworthy:

- Attributable: Every data point must be linked to a specific individual. Clearly identifying the person responsible for collecting or recording data ensures acability, transparency, and prevents fraudulent documentation.

- Legible: Data must be recorded clearly and permanently throughout its lifecycle. This ensures that records can be accurately reviewed, justified, and analyzed at any point in the future.

- Contemporaneous: Data must be recorded at the very moment the activity occurs. Retrospective recording (back-dating) is one of the most critical violations identified during regulatory inspections.

- Original: Data must be preserved in its rawest form (Raw Data). Any changes or corrections must follow established procedures, be signed, and include a valid justification, without overwriting the original data.

- Accurate: Data must reflect the true result of the production or testing activity. This is vital for leadership to make safe, high-quality product release decisions.

2. ALCOA+: Expanding Modern Data Lifecycle Governance

To adapt to complex electronic data systems and the rigorous requirements of EU GMP, the ALCOA+ framework incorporates four additional key elements:

- Complete: Records must include all relevant information, including failed results, re-testing data, or aborted analytical runs. "Cherry-picking" data for reporting is strictly prohibited.

- Consistent: Information must be uniform in format, chronological sequence, and recording methodology across all record types, batch records to certificates of analysis.

- Enduring: Data must be stored securely on durable media or storage systems, supported by robust backup and disaster recovery solutions to ensure stability over many years.

- Available: Records must be readily accessible for retrieval and review whenever required during routine or unannounced regulatory inspections.

3. Strategic Implementation for Plant Management

Successfully implementing ALCOA+ requires a synergy between technology and corporate culture:

- Collection & Operations Phase: Prioritize personnel training on individual acability. Every operation on machinery or analytical equipment must be performed by qualified staff following Standard Operating Procedures (SOPs).

- Storage & Security Systems: Invest in compliant IT infrastructure featuring robust Access Controls and Audit Trails to prevent unauthorized data modification.

- Control & Analysis: Establish routine Audit Trail Reviews conducted by the Quality Assurance (QA) department. Any data discrepancies must be investigated for root causes and managed through the CAPA (Corrective and Preventive Action) system.

Conclusion

The ALCOA+ principles are the benchmark for a modern pharmaceutical facility's credibility. Rigorous implementation of these principles eliminates legal risks, prevents significant financial penalties, and mitigates product recall hazards.

For investors and managers, investing in data integrity is a strategic move to protect brand value and build sustainable trust in the international pharmaceutical market.

Related news

List of EU-GMP Certified Pharmaceutical Factories in Vietnam (Updated 2026)

List of EU-GMP Certified Pharmaceutical Factories in Vietnam (Updated 2026)

23/03/2026 | 400

The pharmaceutical manufacturing industry in Vietnam is undergoing a powerful transformation driven by the internationalization of production standards. While WHO-GMP was once...

Design qualification (DQ): The foundation of investment efficiency in pharmaceutical plants

Design qualification (DQ): The foundation of investment efficiency in pharmaceutical plants

19/03/2026 | 756

In the lifecycle of equipment and system qualification, Design Qualification (DQ) is the initial yet most decisive stage. A minor design flaw...

Governance of compliance risks: Strategic lessons  FDA warning letters and critical CGMP failures

Governance of compliance risks: Strategic lessons FDA warning letters and critical CGMP failures

19/03/2026 | 650

In the increasingly stringent global pharmaceutical landscape, an FDA Warning Letter is far more than a mere regulatory citation. It represents a...

10 Core Changes in the draft degree on cosmetic management 2026

10 Core Changes in the draft degree on cosmetic management 2026

17/03/2026 | 400

Starting 2026, the Vietnamese cosmetic industry will officially enter a new era of governance with the introduction of the Draft Decree on...

Optimizing Investment and Compliance for EU GMP Pharmaceutical Manufacturing Plants

Optimizing Investment and Compliance for EU GMP Pharmaceutical Manufacturing Plants

16/03/2026 | 400

As the global pharmaceutical supply chain shifts toward Southeast Asia, Vietnam is emerging as a strategic destination for high-tech Foreign Direct Investment...

GMP Consultants for Pharmaceutical Manufacturing Companies in Vietnam: Strategic Partners for Global Market Access

GMP Consultants for Pharmaceutical Manufacturing Companies in Vietnam: Strategic Partners for Global Market Access...

13/03/2026 | 500

The Vietnam pharmaceutical market is witnessing an unprecedented transformation, projected to reach a valuation of USD 16.1 billion by 2026. As the...

  • GMPc Vietnam JSC
  • Head Office: No. 18, Mang Cam 1 Street, An Lac Green Symphony, Van Canh Ward, Hoai Duc District, Hanoi City
  • Business location : No. 32, Vi Cam 5 Street, An Lac Green Symphony, Van Canh Ward, Hoai Duc District, Hanoi City
  • Tel: 0243.787.2242 | CEO hotline: 0982.866.668
  • Email: contact@gmp.com.vn
  • Representative Office: 156/1/1, Cong Hoa Street - Ward 12 - Tan Binh District - Ho Chi Minh City
  • Tel: 0283.811.7383 
  • Quick link
  • About Us
  • Services
  • Project
  • GMP-Handbook
  • Video
  • Consulting for cosmetic facility
  • Consulting for health supplement facility
  • Consulting for GSP warehouse
  • Fanpage
Facebook

Copyright © 2020 GMPc. All rights reserved.

  • Home
  • About Us
    • Summary information
    • Key Personnel
  • Services
    • WHO GMP Pharmaceutical facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • EU GMP Pharmaceutical Factory
      • Feasibility study report
      • Design detailed construction drawings
      • QM documentation – Validation
      • GMP application and product dossier application
      • Project management - Construction supervision
    • CGMP, ISO 22716-certified cosmetics facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • CGMP ASEAN Training and Guidance
      • Preparation of CGMP ASEAN/ ISO 22716 registration dossier
      • CGMP ASEAN Re-evaluation consultation
    • Health-supplement facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • HS GMP Training and Guidance
      • Preparation HS GMP registration dossier
      • HS GMP - Re-evaluation consultation
    • Eligibility For Cosmetic Manufacturing
      • Overall consultation
      • Detail Construction and MEP drawing
      • Designing, Constructing, Ensured Certification
      • Preparation of Registration Dossier
    • Pharmaceutical distribution center
      • Feasibility Study
      • Design and Information Technology Solutions
      • Project Management and Supervision
      • GSP registration and operation consultancy
    • GSP warehouses
      • Project feasibility study
      • Detail Construction and MEP drawing
      • GSP Training and Guidance
      • Overall Consultation on Designing And Constructing
      • GSP Re-evaluation consultation
    • Veterinary Pharmaceutical Facilities
      • Project Feasibility Study
      • Technology and Equipment consultation
      • Detail Construction and MEP Drawing
      • Project management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • GMP, GLP, GSP training
      • Basis knowledge
      • Intensive Training
    • Other GPs’s consultation
      • GLP inspection laboratories
      • GDP distribution systems
      • GPP pharmacy
      • WHO GACP medicinal materials
    • Register and Announce
      • Announcement of Imported Cosmetic
    • Dairy Factory
      • Overall Planning
      • Detailed Construction & MEP Design - Project Budgeting
      • Contractor/Supplier Consultation and Project Management
      • Training, Drafting registration dossier
  • Project
  • Video
  • GMP-Handbook
  • Faqs
  • News
  • Jobs
  • Contact
 
Hotline: 0982.866.668
Nhắn tin Facebook Zalo: 0982.866.668