GMPc Vietnam JSC
  • About Us  
    • Summary information
    • Key Personnel
  • Services  
    • WHO GMP Pharmaceutical facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • EU GMP Pharmaceutical Factory  
      • Feasibility study report
      • Design detailed construction drawings
      • QM documentation – Validation
      • GMP application and product dossier application
      • Project management - Construction supervision
    • CGMP, ISO 22716-certified cosmetics facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • CGMP ASEAN Training and Guidance
      • Preparation of CGMP ASEAN/ ISO 22716 registration dossier
      • CGMP ASEAN Re-evaluation consultation
    • Health-supplement facilities  
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • HS GMP Training and Guidance
      • Preparation HS GMP registration dossier
      • HS GMP - Re-evaluation consultation
    • Eligibility For Cosmetic Manufacturing  
      • Overall consultation
      • Detail Construction and MEP drawing
      • Designing, Constructing, Ensured Certification
      • Preparation of Registration Dossier
    • Pharmaceutical distribution center  
      • Feasibility Study
      • Design and Information Technology Solutions
      • Project Management and Supervision
      • GSP registration and operation consultancy
    • GSP warehouses  
      • Project feasibility study
      • Detail Construction and MEP drawing
      • GSP Training and Guidance
      • Overall Consultation on Designing And Constructing
      • GSP Re-evaluation consultation
    • Veterinary Pharmaceutical Facilities  
      • Project Feasibility Study
      • Technology and Equipment consultation
      • Detail Construction and MEP Drawing
      • Project management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • GMP, GLP, GSP training  
      • Basis knowledge
      • Intensive Training
    • Other GPs’s consultation  
      • GLP inspection laboratories
      • GDP distribution systems
      • GPP pharmacy
      • WHO GACP medicinal materials
    • Register and Announce  
      • Announcement of Imported Cosmetic
    • Dairy Factory  
      • Overall Planning
      • Detailed Construction & MEP Design - Project Budgeting
      • Contractor/Supplier Consultation and Project Management
      • Training, Drafting registration dossier
  • Project
  • Video
  • GMP-Handbook
  • Faqs
  • News
  • Jobs
  • Contact

    FAQS

  1. Home
  2. FAQS
  3. LABORATORY CONTROL

List of FAQS

  • GMP GENERAL QUESTION
  • FACILITY AND EQUIPMENT
  • PERSONNEL
  • MATERIAL
  • PRODUCTION AND PROCESS CONTROL
  • HOLDING AND DISTRIBUTION
  • LABORATORY CONTROL
  • RECORD AND REPORT
  • AUDIT
  • OTHER Q&A
What should be done when the phase 1 investigation does not reveal an assignable cause or evidence of error remains unclear?

19/09/2021 | 5209

Similar question:

Reply:

A phase II investigation is initiated, which will involve communication between the laboratory and the manufacturer/contract giver. The decision to undertake any further testing should be agreed and approved within a pre defined testing plan.

Related Q&A

What are the sampling requirements for sterility testing when a finished product batch of a terminally sterilised medicinal... See more What are the sampling requirements for... See more
Can there be any exceptions to this rule? See more Can there be any exceptions to... See more
For an aseptically produced product, where should bioburden monitoring take place? See more For an aseptically produced product, where... See more
What is the maximum acceptable bioburden level? See more What is the maximum acceptable bioburden... See more
What is the background regarding international incidents of glycerol contamination? See more What is the background regarding international... See more
How is the EU patient protected similar contamination occurring in EU products? See more How is the EU patient protected... See more
The registered specifications of our starting materials include conventional or pharmacopoeial methods for the ation of identity but... See more The registered specifications of our starting... See more
What tools are acceptable to use in quality risk management? See more What tools are acceptable to use... See more
How many repeat tests should be conducted? See more How many repeat tests should be... See more
When is it acceptable to average test results? See more When is it acceptable to average... See more
1234..>
  • GMPc Vietnam JSC
  • Head Office: No. 18, Mang Cam 1 Street, An Lac Green Symphony, Van Canh Ward, Hoai Duc District, Hanoi City
  • Business location : No. 32, Vi Cam 5 Street, An Lac Green Symphony, Van Canh Ward, Hoai Duc District, Hanoi City
  • Tel: 0243.787.2242 | CEO hotline: 0982.866.668
  • Email: contact@gmp.com.vn
  • Representative Office: 156/1/1, Cong Hoa Street - Ward 12 - Tan Binh District - Ho Chi Minh City
  • Tel: 0283.811.7383 
  • Quick link
  • About Us
  • Services
  • Project
  • GMP-Handbook
  • Video
  • Consulting for cosmetic facility
  • Consulting for health supplement facility
  • Consulting for GSP warehouse
  • Fanpage
Facebook

Copyright © 2020 GMPc. All rights reserved.

  • Home
  • About Us
    • Summary information
    • Key Personnel
  • Services
    • WHO GMP Pharmaceutical facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • EU GMP Pharmaceutical Factory
      • Feasibility study report
      • Design detailed construction drawings
      • QM documentation – Validation
      • GMP application and product dossier application
      • Project management - Construction supervision
    • CGMP, ISO 22716-certified cosmetics facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • CGMP ASEAN Training and Guidance
      • Preparation of CGMP ASEAN/ ISO 22716 registration dossier
      • CGMP ASEAN Re-evaluation consultation
    • Health-supplement facilities
      • Project feasibility study
      • Technology and Equipment consultation
      • Detail Construction and MEP drawing
      • Project Management and Supervision
      • HS GMP Training and Guidance
      • Preparation HS GMP registration dossier
      • HS GMP - Re-evaluation consultation
    • Eligibility For Cosmetic Manufacturing
      • Overall consultation
      • Detail Construction and MEP drawing
      • Designing, Constructing, Ensured Certification
      • Preparation of Registration Dossier
    • Pharmaceutical distribution center
      • Feasibility Study
      • Design and Information Technology Solutions
      • Project Management and Supervision
      • GSP registration and operation consultancy
    • GSP warehouses
      • Project feasibility study
      • Detail Construction and MEP drawing
      • GSP Training and Guidance
      • Overall Consultation on Designing And Constructing
      • GSP Re-evaluation consultation
    • Veterinary Pharmaceutical Facilities
      • Project Feasibility Study
      • Technology and Equipment consultation
      • Detail Construction and MEP Drawing
      • Project management and Supervision
      • WHO GMP Training and Guidance
      • Preparation of WHO GMP registration dossier
      • WHO GMP Re-evaluation consultation
    • GMP, GLP, GSP training
      • Basis knowledge
      • Intensive Training
    • Other GPs’s consultation
      • GLP inspection laboratories
      • GDP distribution systems
      • GPP pharmacy
      • WHO GACP medicinal materials
    • Register and Announce
      • Announcement of Imported Cosmetic
    • Dairy Factory
      • Overall Planning
      • Detailed Construction & MEP Design - Project Budgeting
      • Contractor/Supplier Consultation and Project Management
      • Training, Drafting registration dossier
  • Project
  • Video
  • GMP-Handbook
  • Faqs
  • News
  • Jobs
  • Contact
 
Hotline: 0982.866.668
Nhắn tin Facebook Zalo: 0982.866.668